The month is printed within the video. It is not an independently verified filming or public publication date. The supplied file is dated 25 September 2026. Selected stills retain the complete frame; no dates or publisher labels have been removed. Audio has not been verified.
Shown: The video labels a broad paved road “Ras El Hekma Ring Road”.
Visible paving supports a dated works report. It does not establish that the route is open to visitors, which entrances it serves, or that all utility connections are working.
Ask: Request the entrance you may use, access permission and a current pickup or delivery point.
Shown: The supplied video labels a coastal building complex “Portaluna Hotel”. The frame shows the buildings, pools and water edge.
A completed-looking exterior does not confirm bookable rooms, an opening date, guest services or residence-owner access. The name is the video’s label; no new hotel pin is inferred.
Ask: Before planning a stay, request the hotel’s current booking channel, available dates and the services included.
Shown: The video labels visible steel structures and surrounding works “Ras El Hekma International Airport”.
This adds developer-reported construction footage to the planned airport information. It does not establish flight operations, an airport code, a runway ready for use or a verified location pin.
Ask: For a trip, use a flight you can actually book and a confirmed road transfer. Read the existing-airport arrival atlas.
Shown: The on-screen caption says the VVIP terminal steel structure is complete.
The claim concerns the steel structure of one terminal. It is not a claim that the airport is complete, commissioned or open to scheduled passenger flights.
Ask: Keep structural completion, equipment installation, approvals and passenger opening as separate milestones.
02 / READ THE WORDS PRECISELY
Construction does not finish in one step.
01
Structure
The frame, floors or steelwork are built. Work on fittings, equipment, roads and services can still remain.
02
Systems ready
Electricity, water, equipment and safety systems are installed, tested and accepted for the intended use.
03
Permission to use
The approvals required for that facility or home are in place. These depend on the component and its use.
04
Open or handed over
A facility accepts users or the allocated home is delivered under its contract. Current operator or contractual evidence is needed.
These are guide explanations, not completion stages awarded to the pictured sites. The VVIP terminal caption refers to steel structure only. No completion percentage is calculated from the images.
A separate government report
On 19 August 2026, Egypt’s State Information Service reported a housing-ministry meeting about implementation, construction and the next phase. It reports Modon saying work continues according to plans and timelines. It does not publish a percentage or an opening date.
Developer plans describe intended design. Dated sales descriptions are separate from an exact offer or contract. Original material is credited to Modon; this guide is independent.
Watch the supplied Modon update with nine chapter readings. Move between building activity, the wider Wadi setting, roads, the Portaluna sequence and airport works.
93-second silent visual editionOn-screen month: August 2026Received: 25 September 2026
The complete original picture sequence is preserved in this silent edition. The readings are written by the guide. Choose a chapter, then use the player’s Play button.
The planned-home count appears over a construction view. The following scenes show work at different stages, without identifying a buyer’s allocated home.
Work crews, machinery and a paved road appear in this sequence. Its label identifies the ring road; it does not confirm visitor access or a usable entrance.
The source labels the buildings Portaluna Hotel. Landscaped and pool areas appear beside work areas. A completed-looking exterior is not a reservation confirmation.
Lounges, terraces, corridors and reception-style spaces follow the Portaluna scenes. The guide does not independently identify an exact room or verify the filming location.
The high view shows the relationship between buildings, pools, the shore and remaining ground works. It does not establish residence-owner access to hotel facilities.
The update labels these scenes as the city’s international airport. They show structures and a marked paved strip, without confirming passenger flights or an airport code.
The caption concerns one terminal’s steel structure. Finishing the equipment, passing official checks and opening to passengers are separate steps. The film ends with coastal views and publisher credits.
The city-vision film illustrates planned homes and services. This update presents construction and hotel scenes. They are different kinds of evidence, with different dates. They are not matched camera views or a before-and-after survey.
For a particular home, ask for a report that identifies its building and work package. For a stay or journey, check the current hotel or transport operator.
The guide reviewed all 93 one-second interval images and nine exact-time chapter frames. This does not claim independent confirmation of every picture, location or filming date. The original audio remains in the private supplied file; this public edition is silent and does not claim an audio transcript.
All 2,325 encoded video frames are retained without re-encoding, cropping, overlays or picture changes. The source month label remains on the frames. The guide has not placed the film onto satellite imagery or inferred the boundary of a home or development.
The VVIP caption is about a steel structure. It does not say the whole airport is ready for passengers. Hotel interiors and landscaped parts can appear alongside unfinished exterior areas. The update does not verify guest opening, visitor access or a home handover date.
Read three city hotel statuses and two nearby reservation routes. See published facilities, coming-soon items, exact source dates and geographic context.